Renewable Energy

Thermo 1 and 2

This 10 MW geothermal plant is located on 40 acres in Beaver County, UT. The power transmission line from the site extends seven miles before connecting into the closest electrical grid. Watson
Engineering services on both design and construction of the geothermal plant included ALTA survey topography, civil design, materials testing, special inspections, construction layout, and pile pull testing. Watson also completed a preliminary layout of a 3 MW solar site.

Thermo 01 Geothermal Phases 1 and 2
Beaver County, UT