The Blundell 34 MW Geothermal Plant project included the integration of a new production well and piping at the existing Blundell Geothermal Power Plant in Beaver County, UT.

Project components included all civil designs and structural foundations, as well as the supply and installation of new overhead power poles, transmission line, and a new step-down transformer. New well head piping, valves, pumps, brine separator, service building, air compressor system, emergency generator and all electrical and instrumentation were installed.